Sample Projects
KGC's Role
Audit investigation of Contract Administration practices and invoicing documentation associated with a Construction Management CCDC 5B arrangement.
Winery Renovation
Project Financial Audit

Royal Alberta Museum
Museum Cladding - Envelope Claim & Counter Claim dispute

KGC's Role
Examine the financial Cause and Effect Impact to the panel supplier of uncoordinated constructability elements.
KGC's Role
Provide a cost-to-cure comparison report based on opposing multiple technical subject matter experts.
Custom Home
Mold Contamination & Workmanship Insurance Dispute

Solar Farm
Subject Matter Expert Report on Critical Path analysis.

KGC's Role
Retained by client’s counsel to opine on late arrival impact on Owner provided solar panels.
KGC's Role
Retained by client’s counsel to opine on valuation of deficiencies associated with General Contractor holdback.
Multi-Residential Facility
Subject Matter Expert Report on deficiencies for mediation.

Commercial Retail Complex
Interim and Final Delay Claim and Quantum Assessment

KGC's Role
Retained by envelope Subcontractor client to provide two separate reports for negotiation with General Contractor.
KGC's Role
Hired by the Client to provide preliminary analysis, risk assessment and risk mitigation planning.
Waste-Water Treatment Plant
Advisory Services to Prepare for Future Claim Dispute

Senior Residence
Rebuttal Report

KGC’s Role
KGC was hired to examine the procurement method and costs associated with a replacement builder to remedy defective envelope workmanship.
KGC’s Role
KGC undertook the role to assist Counsel to the Builder on what constituted “code defects” verses “deficiencies” with the associated quantum.
New High End Custom Home
Construction Deficiencies Dispute

Seniors Residence
Delay Claim

KGC’s Role
KGC Consulting was hired by the Owner to opine on several aspects of the delay related to subsoil impact factors and other scheduled disruptions.
New Hospital Development
Schedule Delay Claim
Trade specialist contractor delayed several months as a result of extensive changes and lack of performance by other inter-dependent trade activity
Condominium High Rise
Schedule Delay Claim
Mechanical contractor delayed several months on scheduled installation
Condominium High Rise
Schedule Delay Claim
Formwork contractor delayed several months as a result of extensive geotechnical issues
Seniors Nursing Home
Rebuttal Report Defence
General contractor required assistance to defend against a multi-million dollar claim launched by a finishing trade contractor
Mid-Stream Energy Project
Schedule Delay & Damages Entitlement Claim
Lump sum piping commissioning subcontract, earned value dispute. Involving various work packages for several process systems
Affordable Housing Dispute
A project delay dispute associated with workmanship deficiencies arose between a general contractor and a municipal housing authority involved in constructing a multi-suite three-storey complex.
Civil Project
Schedule Delay Claim
Civil contractor installing massive retaining wall foundation system for a multi-national corporation.
Commercial Plaza Renovation
Schedule Delay Claim
Major exterior facade upgrades and interior renovations to a retail plaza.
Civil Experience - Piling & Caissons
The civil project involved a slope stabilization project for the installation of micropiles, caisson piles, tie-back anchors and shotcrete to protect the integrity of a public walking trail servicing a housing community to an adjacent green space.
High-Rise Office
Scope of Work Dispute and Schedule Delay Claim
Envelope subcontractor impacted by various root causes on multi-storey urban high-rise office project.
Cost and Scope of Work Housing Dispute
Envelope subcontractor impacted by various root causes on multi-storey urban high-rise office project.
Museum
Schedule Delay Claim
The museum features extensive gallery spaces angled onto a unique set of beetle pine timber 7-beam nodal trusses, two classrooms, a 60-seat Family Theatre, research and collections areas
Hotel
Commercial Management Support
This 139 room Casino Hotel was a turnaround project effort involving KGC to assist First Nations Band Council.
Bridge Replacement
Schedule Delay Claim
This replacement bridge was a new 7-span steel girder structure resting on concrete caissons, grade beams and concrete diaphragm wall end bracing. KGC provided assistance to a trade contractor seeking to avoid liquidated damages
Civil Structure
Schedule Delay Claim
Flood Handling Upgrade in Southern Alberta. This project consisted of a new 42m x 84m long concrete-reinforced sloped spillway structure with interlocking sloped slabs, wing walls, raised and depressed chute and basin accessories.